Notice of Virtual Public Information Centre - Sykes Street North Reconstruction

Posted On Thursday December 24, 2020

January 12, 2021
4:00 PM

Purpose and Background of Project

The Municipality of Meaford intends to reconstruct Sykes Street North, between Lombard Street and Collingwood Street commencing in the Spring of 2021. The project, as proposed, includes the following works:

  • reconstruction of approximately 250 metres of road;
  • replacement of concrete curb, gutter and sidewalk;
  • improvements to the sanitary and storm sewer systems;
  • improvements to the watermain system; and
  • full reinstatement of all areas disturbed during construction (driveways, boulevards, etc.).

What is the purpose of this Public Information Centre (PIC)?

Representatives from the Municipality and Tatham Engineering will be presenting details about the project and associated design and construction matters.
Attendees will be provided with specific information on the following:

  • project design progress;
  • project schedule;
  • construction impacts; and
  • detours and staging.

The PIC will begin at 4:00 PM with a presentation by the Consultants, followed by an open question and answer period. Both Staff and Consultants will be pleased to discuss and answer any questions you may have about the project and impacts to your property/business.

How can you attend the PIC?

Due to the COVID-19 Pandemic, the PIC will be hosted virtually within the Microsoft Teams platform, which will allow residents and business owners to join and participate. The link to join the PIC will be available 1 week prior to the PIC on the Municipality’s project webpage: https://www.meaford.ca/SykesStreet 

Attendees can also call in to the following number: 1 (647) 749-9308 with Phone Conference ID: 867 401 788#

The PIC will be recorded and will be available on the project webpage following the event.

Who do I contact if I have a questions or comment?

If you have any questions regarding the project, please call or email Tatham Engineering Limited, at (705) 444-2565. Office hours are between 8:30 am to 5:00 pm, Monday to Friday.

Chris Collyer,
Manager/Chief Operator, Environmental Services
Municipality of Meaford
21 Trowbridge Street West
Meaford, ON N4L 1A1
Phone: 519-538-1060
E-mail: ccollyer@meaford.ca

Aaron Roeper, P.Eng.
Intermediate Engineer
Tatham Engineering Limited
115 Sandford Fleming Drive,
Collingwood, ON L9Y 5A6
Phone: (705) 444-2565, ext. 2072
E-mail: aroeper@tathameng.com

phone iconContact Us