Gillies Bridge, over the Big Head River, consists of a single span, concrete rigid frame structure. This project will consist of full removal and replacement of the bridge, including the guiderail system.

Virtual Public Information Centre

Held on Thursday March 18th, 2021 from 6:00 to 7:00 p.m.

Download the Presentation Slides

 Project Description

Gillies Bridge is located on Sideroad 3, just west of Grey Road 29, and runs over the beautiful Big Head River. This structure, consists of a single span, concrete rigid frame structure with a total deck length of 16.3 metres and a 7.3 metre wide driving platform between the curbs.

The project will consist of full removal and replacement of the bridge structure including roadside safety devices, and traffic control. Due to the nature of the work, this project will require a full road closure for a large portion of the project length and a detour will be in place.

The bridge design engineering took place in 2020 to allow for construction to proceed within replacement timing identified in the 2020 OSIM Report.

Project Timeline

Start date: May 2021

End date: November 2021

 Budget

The total budget for this rehabilitation project is estimated at $1,682,035. The proposed funding for the project is as follows:

  • 2021 User Fee Levy: $1,534,500
  • Reserves: $147,525
Contact

If you have any questions regarding the project, please call or e-mail: 

Joel Saunders
Capital Projects Coordinator – Linear Projects
Municipality of Meaford
21 Trowbridge Street West, Meaford
Phone: 519 538-1060 ext.1319
E-mail: jsaunders@meaford.ca

James C Baldwin, P. Eng.
Structural Engineer
Ainley Group
550 Welham Road, Barrie, ON L4N 8Z7
Phone: 705-726-3371 Ext. 228
E-mail: baldwin@ainleygroup.com  

 

 Resources

phone iconContact Us