The Municipality of Meaford is undertaking significant road rehabilitation work in 2025 to enhance local infrastructure, improve road safety, and extend the lifespan of its transportation network.
What to Expect During Construction
The Municipality of Meaford wants to make sure everyone knows what to expect during road work. Here is how construction may affect you:
-
Road closures: Roads will be closed during the day while culverts are replaced (from August 25 to 29). There may also be single-lane closures during other parts of the project.
-
Traffic delays: Please expect slower travel times and plan ahead.
-
Noise and dust: Construction will create noise and dust. Crews will try to reduce dust as much as possible.
-
Vibrations: Some equipment may cause small ground vibrations. If you have fragile items in your home, please move or protect them.
To get the most up-to-date information about road closures and detours, view the Municipal 511 map below.
Quicklinks
11th Line Road Rehabilitation
Project Overview
This work involves Low Class Bituminous (LCB) rehabilitation on sections of the 11th Line. The road surface will be replaced using Surface Treatment (Tar and Chip), which involves applying emulsified asphalt and a layer of aggregate for a durable, weather-resistant finish.
Scope of Work
-
Pulverization of the existing road surface
-
Addition of granular material to the base
-
Double application of Surface Treatment (Tar and Chip)
-
Replacement of failed or failing road crossing culverts
-
Installation of approximately 600 metres of guiderail (from 8 Sideroad to 4 Sideroad)
Location
Work is planned for the following segments of the 11th Line:
-
From 16 Sideroad to 13 Sideroad
-
From 13 Sideroad to 10 Sideroad
-
From 8 Sideroad to 4 Sideroad
Timeline (weather dependent)
-
Project start: July 15, 2025
-
Project completed: October 2025
Budget
- $1,035,626.08
- This includes support through the Canada Community-Building Fund (CCBF), which helps municipalities invest in essential infrastructure, such as roads, bridges, public transit, and other key services.
Aiken Street
Project Overview
This project involves High Class Bituminous (HCB) rehabilitation on a section of Aiken Street in Meaford. Work includes replacing existing culverts, pulverizing the road surface, and repaving with new asphalt to provide a smooth, durable driving surface.
Location
Aiken Street, from St. Vincent Street to Richmond Street.
Timeline (weather dependent)
- Project start: September 8, 2025
- Project end: October 3, 2025
3rd Line
Project Overview
This project involves High Class Bituminous (HCB) rehabilitation on a section of the 3rd Line. The work will improve road conditions by replacing culverts, pulverizing the current surface, and laying new asphalt for a long-lasting, smooth finish.
Location
3rd Line between 10 Sideroad and 7 Sideroad.
Timeline (weather dependent)
-
Project start: August 25, 2025
-
Project end: October 3, 2025
-
Advance culvert replacement closures: August 25 to August 29, 2025
Road Closures
Contact Information
Joel Saunders
Project Manager, Infrastructure
Municipality of Meaford
jsaunders@meaford.ca
519-538-1060 extension 1319