When Do I Need a Building Permit?
A building permit is required for new construction, renovations, or repairs to ensure compliance with the Ontario Building Code, zoning, and other regulations. Permits are needed for:
- New Structures & Additions: Any new building over 10 m², carports, garages, decks, porches, rooms, extra stories, barns, or temporary tents.
- Structural Changes: Balconies, dormers, enclosing a porch, window enlargements, solar panels, wind turbines, or excavating for a new basement.
- Plumbing & Utilities: Any structure with plumbing (even under 10 m²), new or replacement plumbing, chimneys.
- Repairs & Replacements: Renovations, structural changes, replacing decks, porches, or carports.
What Does Not Require a Building Permit?
- Minor Repairs & Replacements: Replacing doors, windows (within the same opening, no structural changes), shingles, or plumbing fixtures in the same location.
- Interior Finishes: Painting, wallpapering, tiling, carpeting, cabinets, countertops, and similar non-structural work.
- Small Structures: Storage sheds under 10 m², single-storey, and not attached to other structures.
Before you get Started
During the preliminary planning stage of your project, you must determine the zoning by-law rules that apply to your property. Zoning by-laws regulate the use, size, location and types of structures permitted on all property in the Municipality. Please review the Zoning By-Law first and then contact our Planning Department with specific questions at planning@meaford.ca to discuss your plans. Certain types of development (ie. Commercial, industrial or multi-residential) may also require Site Plan Approval. Please contact the Planning Staff to determine if Site Plan Approval will be applicable to your project.
Entrance Permit and Civic Address |
You will also need to have an approved entrance permit and civic address in order to be issued a building permit. If the project is a new build and you do not have an existing entrance, fill out the application form and email a diagram of your entrance location for our roads department (roads@meaford.ca) to schedule a site visit and submit an application for your civic address to be issued. You will also need to pay the entrance permit and civic addressing fees at the Development Services Office located at 15 Trowbridge St W. |
Lot Grading and Third Party |
Your Grading and Drainage Plan will be reviewed by our third-party engineer to determine whether the proposed plan will negatively affect the neighbouring properties or municipal boulevard. Our third-party engineer will communicate with the applicants engineer until a desired grading and drainage plan is agreed upon through the use of a checklist. Submitted lot grading plans must include contact information (email address, phone number, etc. of designer.) Building permit applications are not deemed to be complete until third party approved reviews have been submitted. |
Existing On-Site Sewage Evaluation |
If your property utilizes an on-site sewage system (septic system) and you intend to use the existing septic system for your new project, your application must be accompanied by an approved septic system evaluation form. This is a desktop evaluation performed by the Building Services Department. These are a few items that may trigger a septic system evaluation.
|
Demolition Release Form |
If you need to obtain a demolition permit, you will need to provide a demolition release form with the signatures of all applicable parties that are required to be communicated prior to the issuance of a permit. Included in the application the applicant must provide details where the debris will be removed to and how the site will be altered to be deemed safe once the debris is removed. |
By-laws |
If your project is subject to any of the following By-laws, please review to ensure compliance. |
Other |
Heritage Conservation District
Grey Sauble Conservation Authority
Niagara Escarpment Commission
County of Grey
Ministry of Transportation Ontario
Ministry of Natural Resources
|
Cloudpermit
What is Cloudpermit? |
Cloudpermit is an online permit application website (not an app) that allows the applicant to track their entire project, from submission of their application to the completion of the project. Cloudpermit is designed to better help homeowners, contractors and consultants submit their building permit application. Providing them the ease and comfort of tracking their application while communicating with Building Services staff anywhere they want. |
Why are we using Cloudpermit? |
The Municipality of Meaford has decided to switch to Cloudpermit to provide the public with an easier way to apply for a building permit and track the progress from start to finish. These are some of the features that led to the municipality's decision to go to Cloudpermit:
|
Who do I contact for help with applications? |
You can contact the Building Department by phone at 519-538-1060 ext. 1127, by email building@meaford.ca |
What do I do after I submit my application? |
You will need to make payment for the application by mail or in person at our office. You will receive emails with updates from Cloudpermit during each stage of the process.
When you have reached the payment part of your online application, we have set up the following options to serve you best:
|
Where do I find my building permit and approved drawings? |
You can find your building permit approved drawings under the address of the property at the top of your application page title "Download Permit". You will now have access to the permit and drawings. Please make sure that the building permit is posted on the property and visible from the road prior to construction starting. |
How do I access inspections? |
Inspections can be found under the "Work & Construction" tab of your application. Visit Cloudpermit’s support page for additional information. |
How to use Cloudpermit |
Click here to watch the instructional video on how to submit a building permit with Cloudpermit.
A final inspection is required for all projects but may be completed during the same time as another inspection if no other work is outstanding. The project is not complete until all required documentation has been received and all inspections have passed. Please note that all deposits taken upon issuance of the permit will be returned once a final inspection has been passed and all applicable departments have provided confirmation with our Finance Department. For additional support, please visit Cloudpermit - Support |
Fees and Charges
Building Permit Fees |
Please refer to the 2025 Fees and Charges for up to date fees. Payment Options:
Important Notes:
|
Development Charges |
Certain development projects in Meaford may require Development Charges, including:
Development Charges for the County of Grey apply only to new residential development. Important Note: |
Ontario Building Code
The Province of Ontario has introduced a new Building Code aimed at reducing regulatory barriers in the construction industry, improving building safety and quality, and simplifying the process of building housing.
Timing and Transition Provisions
The 2024 Building Code comes into effect on January 1, 2025, with a three-month grace period until March 31, 2025, for certain designs that are already underway.
Please take careful note of the following transition period dates:
January 1, 2025 to March 31, 2025
-
Permit applications may be submitted using the new 2024 Building Code
-
Permit applications may be submitted using the 2012 Building Code if the applicant demonstrates that their working drawings were substantially complete by December 31, 2024
April 1, 2025
-
Permit applications must be submitted using the 2024 Building Code