Playground Surface Replacement
This project was completed in November 2023 as part of the Municipality of Meaford’s 2023 Capital Projects.
This project will replace the existing pea gravel playground surface at select municipal parks with engineered wood fiber.
Project Description |
This project will replace the existing pea gravel playground surface at Peter Cameron Park, Bognor Community Park, and McCarroll Park with engineered wood fiber. The Municipality conducts playground inspections annually. Inspections are conducted by a Registered Playground Practitioner, and review the equipment itself, and the surroundings. In 2022, the third party inspectors identified pea gravel is no longer recognized as a safe grounding material for playgrounds, and recommended that the Municipality replace existing pea gravel surfaces with engineered wood fiber. |
Project Timeline |
Peter Cameron Park: June 19, 2023 to June 23, 2023 (Completed) Bognor Community Park: June 19, 2023 to June 23, 2023 (Completed) McCarroll Park: November 14, 2023 to November 15, 2023 (Completed) |
Budget |
$33,000 from Reserve Funds. |
Contact |
Cassandra Cesco
Project Manager, Facilities Municipality of Meaford 519-538-1060 extension 1316 |